Excavations Permit

Excavations Permit

Version: 9.0

Updated: 01 Jan 2014

Document Summary

This document serves as an Excavations Permit template, detailing procedures and controls for safe excavation work. It includes sections for recording permit numbers, risk assessment numbers, and the start and end times of the permit. The description of work outlines the scope, with specific requirements for identifying and marking underground services, including electricity, gas, water, and telecommunications.

Environmental and site risks, such as heritage sites, vegetation, and adjacent structures, are assessed and controlled. Measures to prevent cave-ins or collapses, such as trench shoring, benching, and battering, are specified. The permit also mandates daily inspections, barricades for trenches over 1 meter deep, and the proper placement of excavated materials. Sign-on/sign-off records ensure accountability, while post-completion reviews facilitate continuous improvement for similar tasks.

Disclaimer

The information provided on this website is for general informational purposes only and is supplied by third parties or other external sources. While we strive to ensure the accuracy and completeness of the content, we make no guarantees, warranties, or representations of any kind, either express or implied, about the reliability, suitability, or availability of the information provided.

It is the responsibility of the user to independently verify and validate the information before relying on it or making decisions based on it. We accept no liability for any loss or damage, including but not limited to indirect or consequential loss, arising from the use or reliance on this information.

By using this website, you acknowledge that you are solely responsible for verifying the accuracy and applicability of any information presented. If you have questions or require specific advice, please consult a qualified professional.